Top menu

Custom Search 1

New Images

April 25, 2006
Experimental setup on ESRF beamline ID09 for the study of ultra fast processes: sample support (right) and detector (left). (Credit: P. Ginter/ESRF)
April 25, 2006
Along the Spanish beamline BM25 (Spline) in the ESRF experimental hall. (Credit: P. Ginter/ESRF)
April 25, 2006
Undulator alignment in the ESRF electron storage ring. (Credit: P. Ginter/ESRF)
April 23, 2006
Bending magnet installed on the ESRF electron storage ring. (Credit: P. Ginter/ESRF)
April 23, 2006
Three undulators installed inside a straight section of the ESRF electron storage ring. (Credit: P. Ginter/ESRF)
April 23, 2006
In the ESRF electron storage ring tunnel. (Credit: P. Ginter/ESRF)
April 21, 2006
Infrared light extraction from the ESRF storage ring. (Credit: P. Ginter/ESRF)
April 21, 2006
Radiofrequency cavity for accelerating electrons in the ESRF booster synchrotron tunnel. (Credit: P. Ginter/ESRF)
April 21, 2006
Installation of an undulator in the ESRF electron storage ring. (Credit: P. Ginter/ESRF)
April 21, 2006
Vacuum tank containing a cryogenically cooled silicon single crystal for selecting monochromatic X-rays in the first hutch of ESRF beamline ID23. (...
Feedback